House A4 «am Rietpark»
Close
Close
Site: | Schlieren, ZH |
Client/Organizer: | Halter AG, general contractor |
Year: | 2006 - 2009 |
Type: |
|
Program: |
|
Mode: | Study contract invited, Startprojekt |
Collaborators: | Matthias Amsler, Esther Bärfuss, Andreas Feurer, Dirk Hamdorf, Stefanie Brunner, Alessia Geisshüsler, Susanne Häbold, Rina Nagel, Fabienne Siegenthaler |
Investor: | IMMOSIP AG Zürich, c/o UBS Fund Management (Switzerland) AG, Basle |
Total contractor: | Halter AG, Zurich |
Civil engineer: | HMK Kuhn AG, Dietikon |
Building technology: | Ahochn AG, Dübendorf |
Electrical engineering: | R + B Engineering AG, Brugg |
Acoustic and building physics: | Kopitsis Bauphysik AG, Wohlen |
Landscape: | Andreas Geser Landschaftsarchitekten, Zurich |
Picture: | Hannes Henz, Zurich / Dominique Marc Wehrli, Winterthur |
Status: | Realized |
Project Number: | 079 |
As the initial project, the house on site A4 served as both signal and impulse for the development of the whole area. Like all of the four houses, this building also comprises only two staircases. Single-story and maisonette apartments are interwoven in a complex manner, sometimes revolving around a prominent double-story open air space. The striking silhouette of the L-shaped high-rise figure with the pitched rooflines over the lower structure create subtle light effects on the surface of the facade’s eggshell-white Eternit panels and the ornamentally perforated aluminum sheets of the balcony parapets.